I am working on a structure that has a landing/second floor at 14'-6" above finish floor and a roof at 26'-0'. The landing/second floor is on one corner only, it is not the full width and length of the roof plan area. Also, the floor/landing is being supported by hangers from two sides and connected two the walls on the other two sides. Laterally the floor/landing has a shearwall on one side supported from the roof and it is connected to a full ht shearwall on the other side. Is a vertical distribution of seismic forces required?