marinaman
Structural
- Mar 28, 2009
- 195
I have a project where I have some beams coming into a steel girder at a 45 degree angle.
The connections of the beams to the girder are all single plate bolted connections.
During the erection process, only one bolt was initially installed by the erector for each of the 45 degree beams. He was going to go back and install the rest of the bolts as he progressed in erection.
Now, when he went back to install the rest of the bolts into the single shear plate bolted connections, the holes are slightly misaligned to where he can not get the 3/4" diameter A325's installed. Due to the each beam's angle, and the stiffness of the surrounding members, he's not able to wrangle the steel to get the holes to align in order to install the bolts.
In brainstorming, the idea was floated to install 5/8" diameter A490's into the misaligned holes previously intended for the 3/4" diameter A325's.
In theory, the load capacity would be acceptable.
Has anyone done this before? I can't think of where this might be prohibited by the code.
I'm trying to explore all of my possible options. I do not want to weld this connection, as its geometrically too tight to get good weld where it would need to be placed.
Opinions appreciated.
The connections of the beams to the girder are all single plate bolted connections.
During the erection process, only one bolt was initially installed by the erector for each of the 45 degree beams. He was going to go back and install the rest of the bolts as he progressed in erection.
Now, when he went back to install the rest of the bolts into the single shear plate bolted connections, the holes are slightly misaligned to where he can not get the 3/4" diameter A325's installed. Due to the each beam's angle, and the stiffness of the surrounding members, he's not able to wrangle the steel to get the holes to align in order to install the bolts.
In brainstorming, the idea was floated to install 5/8" diameter A490's into the misaligned holes previously intended for the 3/4" diameter A325's.
In theory, the load capacity would be acceptable.
Has anyone done this before? I can't think of where this might be prohibited by the code.
I'm trying to explore all of my possible options. I do not want to weld this connection, as its geometrically too tight to get good weld where it would need to be placed.
Opinions appreciated.