Due to vendor fault in one of oil and gas project, several valves were manufactured and when they were going to be assembled at pressure gauge conjunction there was not enough space for heavy hex nuts therefore those guys in the field decided to use jam nuts (3/4" ASTM A194, Gr. 2H) to assemble the studs (3/4", ASTM A193 Gr. B7) for ASME B16.5 flange class 900. This is strict violation of project specification which says all nuts shall be heavy hex, but those line are already under operating pressure of 90 bar and no leakage happened. Suppose we are going to investigate acceptance of these nuts in this situation, the questions are:
1- As it is obvious that shearing stress is increased in the mating threads of bolt and nuts, how these shearing stress shall be calculated (considering the nuts was not tightened with torque metered wrench). I know there is a formula in appendix B of ASME B1.1 for shearing area. The problem is that I don't know how to calculate LE in it).
2- Why ASME B31.3 gave such a low design stress for ASTM A193 bolting? If we are not allowed to pass beyond this design stress, even heavy hex can not be satisfactory. On the other hand, if we are allowed to pass this design stress value, how far can we go (please answer with reference to the code).
3- As I got from appendix S of ASME SEC. VIII, DIV 1, We shall tighten the nuts so that there will be no leakage in hydrotest, without breakage of the bolt and nut, if so, this is our case.
Thanks in advance.
Nothing is more fairly distributed than common sense: no one thinks he needs more of it than he already has. Rene Descartes
Due to vendor fault in one of oil and gas project, several valves were manufactured and when they were going to be assembled at pressure gauge conjunction there was not enough space for heavy hex nuts therefore those guys in the field decided to use jam nuts (3/4" ASTM A194, Gr. 2H) to assemble the studs (3/4", ASTM A193 Gr. B7) for ASME B16.5 flange class 900. This is strict violation of project specification which says all nuts shall be heavy hex, but those line are already under operating pressure of 90 bar and no leakage happened. Suppose we are going to investigate acceptance of these nuts in this situation, the questions are:
1- As it is obvious that shearing stress is increased in the mating threads of bolt and nuts, how these shearing stress shall be calculated (considering the nuts was not tightened with torque metered wrench). I know there is a formula in appendix B of ASME B1.1 for shearing area. The problem is that I don't know how to calculate LE in it).
2- Why ASME B31.3 gave such a low design stress for ASTM A193 bolting? If we are not allowed to pass beyond this design stress, even heavy hex can not be satisfactory. On the other hand, if we are allowed to pass this design stress value, how far can we go (please answer with reference to the code).
3- As I got from appendix S of ASME SEC. VIII, DIV 1, We shall tighten the nuts so that there will be no leakage in hydrotest, without breakage of the bolt and nut, if so, this is our case.
Thanks in advance.