studaddy
Structural
- Sep 28, 2013
- 4
we have a pqr for stainless 308 l using the stt process with a backing gas [open butt pipe] the bosses son refuses to use the argon that was used to qualify and wants to use solar flux instead . my position is we have to qualify a new pqr and our welders since we are deleting an essential variable and replacing it with a paste flux . any other ideas out there ?