PengStruct
Structural
- Jun 9, 2010
- 39
When I run my model for a 4 story building with 5 moment frames the Pdelta and DAM takes an hour for the initial run.
Does this sound like a normal run time? Is it acceptable to analyze 1 bent only for the stability check? All frames are the same.
Does this sound like a normal run time? Is it acceptable to analyze 1 bent only for the stability check? All frames are the same.