abusementpark
Structural
- Dec 23, 2007
- 1,086
I've seen where some pre-engineered wood roof truss engineers will provide uplift reactions based on MWFRS pressures, and consequently, the hurricane ties at each truss support are sized based on MWFRS pressures.
What you do you guys think about that? I really wish ASCE 7 would further clarify the differences between MWFRS and C+C. I think this is one of those gray areas.
What you do you guys think about that? I really wish ASCE 7 would further clarify the differences between MWFRS and C+C. I think this is one of those gray areas.