I have a 17 ft. span 6" deep hollowcore slab with 2" topping for an open canopy wing, so the ASCE 7-10 wind uplift used is the overhang area for pressure (approx. 78 psf ultimate uplift). The specialty engineer submitted gravity load calcs only. Despite a net downward dead load, as the slab self-weight is relieved could critical tension stress in the unreinforced top of slab develop depending on the negative precamber balanced by the slab self weight? Therefore am I not reasonable to demand uplift stress calcs. I have no problem with stability (W+D) per ASCE 7-10.