HiSet
Electrical
- Oct 10, 2002
- 70
What criterion should be followed for designing Under frequency load shedding scheme i.e. should it be based on security i.e.by having contact of main and check relays in series to issue trip or should it be based towards reliability or dependability i.e. by having contact of main and check relays in parallel for trip?