I have used them as well for small applications with only a few framelines. However, during preliminary design of a 3 story hospital addition, the contractor requested bolted web/welded flange connections for constructability in lieu of extended end plates. It sounded like they had an issue in the past where the beams came in right at dimension, but the columns were slightly off. So they had to have the beam refabricated to allow the columns to remain vertical. He said that if the same would have happened with a welded flange, they would have been able to grind the flanges back a little bit. Since the web bolt holes were slotted in the hz direction, it would have been a faster, cheaper field fix. This company sets a lot of structural steel so I have filed this little piece of information in the back of my brain for future use. Of course, this all goes away if the steel is set to plan.