structSU10
Structural
- Mar 3, 2011
- 1,062
Looking at treating a new concrete topping slab as composite with an existing two way slab as a part of a rehabilitation effort. The issue I get is development of the shear reinforcement across the interface - the code requires this to be developed but I don't have enough depth to do that in the existing slab. My only thought was a through bolt and plate so it is anchored but it makes me wonder what I do to develop it into the topping.
Is anyone aware of a system I can count on to meet the code requirement for development?
Is anyone aware of a system I can count on to meet the code requirement for development?