sberbece
Electrical
- Sep 15, 2003
- 39
Hello!
I am working on a feasibility study, where I have to define a concept design and estimate de cost of the project.
In this project, the process plant load will be supplied through a transmission line from a hydro power plant. The transmission line should be double circuit, each circuit rated for 600 MVA. Plant load 600 MVA (50 Hz).
Transmission line length, up to 300 km. Plant operating time per year, 8000 hours. Plant life time 20 years.
Question. What voltage level would be recommended for the transmission line, 400 kV or 525 kV?
Thank you in advance!
Regards,
Stefan
I am working on a feasibility study, where I have to define a concept design and estimate de cost of the project.
In this project, the process plant load will be supplied through a transmission line from a hydro power plant. The transmission line should be double circuit, each circuit rated for 600 MVA. Plant load 600 MVA (50 Hz).
Transmission line length, up to 300 km. Plant operating time per year, 8000 hours. Plant life time 20 years.
Question. What voltage level would be recommended for the transmission line, 400 kV or 525 kV?
Thank you in advance!
Regards,
Stefan