Our company has provided a moment connection design using the minimum offset for entering and tightening clearances at 1 1/4" diameter bolts (1 11/16" side clears per pg 4-137 of the 1989 AISC ASD manual).
Lo and behold - the erector cannot complete full pre-tensioning of these bolts using standard equipment. His attempts to locate tools to tigthen the bolts adequately and that fit in this clear dimension have been unsuccessful.
Any suggestions?