Hi guys,
I have been asked to provide a timber bollard with a concealed connection. I have this typical detail that I am following (attached), the difference is I am using a timber bollard.
I plan on either screwing or chemically fixing a stud into the centre of the bollard and then chemically anchoring that stud to a drilled hole in the concrete slab.
Are there any problems with doing this, such as splitting of the timber bollard or strength issues when load is applied to the bollard.
All comments will be appreciated.
Do anyone have a typical detail they use for this application?
I have been asked to provide a timber bollard with a concealed connection. I have this typical detail that I am following (attached), the difference is I am using a timber bollard.
I plan on either screwing or chemically fixing a stud into the centre of the bollard and then chemically anchoring that stud to a drilled hole in the concrete slab.
Are there any problems with doing this, such as splitting of the timber bollard or strength issues when load is applied to the bollard.
All comments will be appreciated.
Do anyone have a typical detail they use for this application?