The only point that the contractor made is that he is an idiot. Yes, the drawing is not that great. Okay, it's even bad but if the contractor thought you wanted this, why didn't he asked what the dimensions are supposed to be? Did he scale it? One of the first things I was taught after I came out of my mother's womb is never scale a drawing. Now I see why.
As for the comment about there is no arrow. I rarely see arrows on this kind of detail symbol.
I've beat up the contractor, now let's talk about the drafter for a second. I get sick and tired of trying to explain to drafters how stupid people can be and why you have to bend over backwards to make drawings clear. I work with a guy who has been doing this for 30 years and he still doesn't get it.