cvg
Civil/Environmental
- Dec 16, 1999
- 6,868
Anyone ever heard of an agency requiring a 60 minute Tc for each catch basin on an urban roadway? C values are all 0.95 for pavement and design is for a 10-year storm. I am speculating that this was a blunder by the engineer doing the report as it appears to underestimate peak runoff and water quality volumes by about a factor of 3.