jlmiller
Chemical
- May 23, 2001
- 8
I have been assigned to install a vapour balance line between the tank trucks and solvent storage tank.
Is it standard practice to install a detonation arrester in the balance line? This would be a dedicated balance line from the storage tank to the tank truck.
I realize that when storage tank vents are connected, a detonation arrester should be installed, but I am not sure about a loading station.
Is it standard practice to install a detonation arrester in the balance line? This would be a dedicated balance line from the storage tank to the tank truck.
I realize that when storage tank vents are connected, a detonation arrester should be installed, but I am not sure about a loading station.