I have installed a good soft start from another unit and will probably do the smoke test in the next few hours. I was going to rebuild the old soft start and use the 5 HP motor to test it. I know that even at locked rotor it cannot short the SCR.
Instead of rebuilding the old soft start I thought about installing a new soft start, one rated at 500HP across the line but 700HP inside the delta (no need to go into the pros and cons about inside the delta)to save money, time and embarrassment. I have 12 350KCMIL cables between the location of the soft start and the motor peckerhead, cable length is 30'. This will give me two 350KCMIL cables per phase, is this enough?
The shop gloves are still in their bag and have never been used. My new tool is a length of 14 gauge green wire that I use to check after I check with the meter.