What would be the standard of care in the following case (i.e. what is the appropriate action by the engineer in the following example for public safety, which is a Fundamental Cannon in the Code of Ethics):
Prospective client invites engineer to their facility where structure distress is suspected. Significant(about 1-ft size) concrete pieces falling from structure have almost hit workers on occassion; however, some workers at facility are unaware of danger posed. Client calls engineer to site for evaluation/recommendations.
Upon visiting site, it is visually apparent that significant corrosion of concrete rebar from manufacturing process has caused spalling of concrete and the integrity of concrete is suspect in some trafficked areas. Based on engineering experience, it is believed that similar failures will be realized in the near future and workers at the facility could be seriously injured where exposed to these areas.
The engineer offers a proposal for a phased approach evaluation/recommendations and suggests unsafe areas be cordoned off until an engineering evaluation has been completed.
Client does not respond to proposal and it is unclear how the worker safety has been addressed.
What is the engineer's/companies obligation at this time?
Prospective client invites engineer to their facility where structure distress is suspected. Significant(about 1-ft size) concrete pieces falling from structure have almost hit workers on occassion; however, some workers at facility are unaware of danger posed. Client calls engineer to site for evaluation/recommendations.
Upon visiting site, it is visually apparent that significant corrosion of concrete rebar from manufacturing process has caused spalling of concrete and the integrity of concrete is suspect in some trafficked areas. Based on engineering experience, it is believed that similar failures will be realized in the near future and workers at the facility could be seriously injured where exposed to these areas.
The engineer offers a proposal for a phased approach evaluation/recommendations and suggests unsafe areas be cordoned off until an engineering evaluation has been completed.
Client does not respond to proposal and it is unclear how the worker safety has been addressed.
What is the engineer's/companies obligation at this time?