I have always been told through my school days that structural engineering fees should be .5-1.5% of construction costs. When preparing proposals for projects I figure out how much time the project will take tan then multiply it by my hourly rate. For a check, I try to estimate construction costs and apply the %'s listed above to make sure I am at least in the correct zip code. The problem that I have is that no one has ever told me if that is based upon the shell of the building or the building with finishes. Would it be possible for anyone to give advice as to how to properly apply these %'s?
For example, a 40,000 square foot office building I have the following:
$120/square foot for the "shell".
$200/square foot for the "shell" plus finishes.
What number would one apply these % numbers to?