Jan 14, 2013 #1 judeotuks Structural Joined Jan 14, 2013 Messages 18 Location GB I will be going for a site visit of an existing offshore platform which is to be linked to another platform (proposed) via a bridge connection. Please does anyone have a typical verification checklist from a structural point of view?
I will be going for a site visit of an existing offshore platform which is to be linked to another platform (proposed) via a bridge connection. Please does anyone have a typical verification checklist from a structural point of view?