Hello everyone-
I'm a structural PE who typically deals with residential design, but am working hard to move into the commercial realm. After a lot of hard work, I've been given an opportunity to provide a proposal for a new apartment complex. The proposal will be for the structural design and will include the framing/foundation as well as any necessary meetings/RFIs. There will be five possible building types spread across 15 apartment buildings in the complex - meaning each building will be built more than once. Additionally there will be ancillary structures (clubhouse, garages, mail kiosk, etc.). I'm trying to win this project, but am having a hard time with determining the amounts I should include in my bid.
Here are my thoughts on options to determine my quote:
1) Based on square footage of each building (if I choose this one, whats a reasonable SF rate?)
2) Based on square footage of the initial design of each building type, then for each of the repeating building types charge 75% of the initial design fee (i.e. if building type 1 is built 5 times, the 1 building will be the full square footage rate and the other four will be 75% of that amount)
3) Based on a percentage of the total project construction cost - somewhere in the 3-4% neighborhood
If I choose one of these options, should an additional hourly fee be included for the meetings/RFIs/revisions?
Help me win this job!! Thanks in advance for any insight you can offer me!
I'm a structural PE who typically deals with residential design, but am working hard to move into the commercial realm. After a lot of hard work, I've been given an opportunity to provide a proposal for a new apartment complex. The proposal will be for the structural design and will include the framing/foundation as well as any necessary meetings/RFIs. There will be five possible building types spread across 15 apartment buildings in the complex - meaning each building will be built more than once. Additionally there will be ancillary structures (clubhouse, garages, mail kiosk, etc.). I'm trying to win this project, but am having a hard time with determining the amounts I should include in my bid.
Here are my thoughts on options to determine my quote:
1) Based on square footage of each building (if I choose this one, whats a reasonable SF rate?)
2) Based on square footage of the initial design of each building type, then for each of the repeating building types charge 75% of the initial design fee (i.e. if building type 1 is built 5 times, the 1 building will be the full square footage rate and the other four will be 75% of that amount)
3) Based on a percentage of the total project construction cost - somewhere in the 3-4% neighborhood
If I choose one of these options, should an additional hourly fee be included for the meetings/RFIs/revisions?
Help me win this job!! Thanks in advance for any insight you can offer me!