milkshakelake
Structural
- Jul 15, 2013
- 1,189
I have a stepped excavation where I'm using a raker on an existing wall. About 3' inboard, I'll have a soldier pile to do the next step of the excavation.
I'm wondering how to do the forces on the lower step. Is my concept correct? I'm basically using the resultant at the bottom of the existing wall so that I don't double count the height of the soil behind the existing wall (which is mostly going into the raker laterally).

I'm wondering how to do the forces on the lower step. Is my concept correct? I'm basically using the resultant at the bottom of the existing wall so that I don't double count the height of the soil behind the existing wall (which is mostly going into the raker laterally).