Excavation >20'

Hoboneer

Structural
Joined
Sep 19, 2016
Messages
18
Location
US
There's an OSHA trigger that if excavation is deeper than 20' it requires a "design by a professional engineer".

If it's just an open excavation at 1.5:1 max slope, is anything else required besides a basic plan showing the extent of excavation, a section showing the max slope, reference to the type of soil and some daily inspection notes?
 
global stability check
Duration of excavation
How are spoils removed and where to
Slope stabilization might be needed, if something rolls down it could be dangerous so maybe some type of structure to stop debris
Prevent water from eroding the bank
 