Should open web steel joist shop drawing submittals be stamped?
I know that I never seen them stamped. But as far as whether or not they SHOULD be stamped, I'm not sure. The EOR usually sizes the joists based on the tables given in a joist manufacturer's catalog, but gives a net uplift design requirement for the which the joist supplier must consider. It seems like the uplift portion of the joist should be stamped somehow.
I know that I never seen them stamped. But as far as whether or not they SHOULD be stamped, I'm not sure. The EOR usually sizes the joists based on the tables given in a joist manufacturer's catalog, but gives a net uplift design requirement for the which the joist supplier must consider. It seems like the uplift portion of the joist should be stamped somehow.