I have W16 and W8 collectors spanning parallel to 3 inch metal roof deck. Ribs are spaced at 8 inches oc, and are less than 2 5/8" wide. Low to moderate seismic zone (SDC B).
Other than specifying a member with a flange large enough to ensure its beneath a flute, i was curious what others have done to make sure the connection can be made.
Do you note that the deck is to be cut at fitted over top of the flanges? add a wide hot rolled or cold form top flange plate?
Im dealing with a factored diaphragm force of about 800plf.
Other than specifying a member with a flange large enough to ensure its beneath a flute, i was curious what others have done to make sure the connection can be made.
Do you note that the deck is to be cut at fitted over top of the flanges? add a wide hot rolled or cold form top flange plate?
Im dealing with a factored diaphragm force of about 800plf.