I do not want to generate a high compressive stress on an (e)6" cmu wall for that reason instead of having my HSS 10x4x1/2 beam sit with an end bearing plate on the (e) 6" cmu wall I am planning on placing another stiff HSS 10x5x1/4 beam fully on top the (e) 6" cmu wall, and connect HSS beams together. This is the first time I am dealing with this type of a condition, and I would like to get your thoughts on the behavior of the beam and cmu wall for the described condition.
Here is the question. How do you guys think that the beam will behave on the (e) 6" cmu wall ? Do you guys distribute the reaction from the ends of the beam with a 45 degree along the height of the wall even though the beam will be distributing the vertical load uniformly along the length of it ?
Also, how do you guys approach to design of the anchors between the beam and (e) cmu wall ?
Attachment is indicating what I am planning on doing ..
The reaction is 15kips.
*(e)= existing
I do not want to generate a high compressive stress on an (e)6" cmu wall for that reason instead of having my HSS 10x4x1/2 beam sit with an end bearing plate on the (e) 6" cmu wall I am planning on placing another stiff HSS 10x5x1/4 beam fully on top the (e) 6" cmu wall, and connect HSS beams together. This is the first time I am dealing with this type of a condition, and I would like to get your thoughts on the behavior of the beam and cmu wall for the described condition.
Here is the question. How do you guys think that the beam will behave on the (e) 6" cmu wall ? Do you guys distribute the reaction from the ends of the beam with a 45 degree along the height of the wall even though the beam will be distributing the vertical load uniformly along the length of it ?
Also, how do you guys approach to design of the anchors between the beam and (e) cmu wall ?
Attachment is indicating what I am planning on doing ..
The reaction is 15kips.
*(e)= existing