Dear All,
The gas plant is tied-in to the pipeline A. The gas plant design pressure is P1, and the pipeline A DP is P2. The pipeline after few kilometres will end with the metering station and will be tied to the another pipeline (B) than design pressure is P3 see attached sketch)
The Client suggested that pipeline A and everything downstream should have the design pressure P2=P3.
so P1 < P2 = P3
1st concern is how to prevent the gas plant from the gas flow-back scenario after Plant ESD action for example. I could not find any information in 31.8 for this case.
One of the solutions that comes to my mind could be to install pressure switch downstream the ESDV-3 and to close ESDV-3 once the pressure is close to P1. But then it is pointless to design both the pipeline A and the metering station for P3 design pressure.
The client does not want to hear about HIPP
I have not came across in the 31.8 how to prevent from back flow overpressure scenario. I will go through 31.3, but maybe someone is familiar with any requirements for that.
I would appreciate your comments and any advices.
Thank you.
The gas plant is tied-in to the pipeline A. The gas plant design pressure is P1, and the pipeline A DP is P2. The pipeline after few kilometres will end with the metering station and will be tied to the another pipeline (B) than design pressure is P3 see attached sketch)
The Client suggested that pipeline A and everything downstream should have the design pressure P2=P3.
so P1 < P2 = P3
1st concern is how to prevent the gas plant from the gas flow-back scenario after Plant ESD action for example. I could not find any information in 31.8 for this case.
One of the solutions that comes to my mind could be to install pressure switch downstream the ESDV-3 and to close ESDV-3 once the pressure is close to P1. But then it is pointless to design both the pipeline A and the metering station for P3 design pressure.
The client does not want to hear about HIPP
I have not came across in the 31.8 how to prevent from back flow overpressure scenario. I will go through 31.3, but maybe someone is familiar with any requirements for that.
I would appreciate your comments and any advices.
Thank you.