I have a CS vessel in operation that was POST WELD HEAT TREATED because of the sour service. Can we install SS Internal linnig on the vessel shell and bottom head to avoid any errosion that is only becuase of catalyst loading/unloading?
Normally welding after PWHT is not allowed but i believe since this linning will isolate CS shell and bottom head from sour gas therefore It may be ok to intall SS linning on post weld treated vessel. PWHT after linnig installation would not be possible.
Normally welding after PWHT is not allowed but i believe since this linning will isolate CS shell and bottom head from sour gas therefore It may be ok to intall SS linning on post weld treated vessel. PWHT after linnig installation would not be possible.