Frank1344
Mechanical
- Apr 25, 2005
- 133
Hello,
Recently we are engaged in design of a couple of hot taps for our Client.
Our Client's spec is considering Split Tee as a Temporary Fitting and leaves it for the last option to be considered for design the Hot Tap connection.
I bring this issue to this forum to get your ideas and opinions about this.
I am not able to find any Standard, Code, practices,.. to address such a thing.
Thanks a lot,
Frank
Calgary, Alberta
Recently we are engaged in design of a couple of hot taps for our Client.
Our Client's spec is considering Split Tee as a Temporary Fitting and leaves it for the last option to be considered for design the Hot Tap connection.
I bring this issue to this forum to get your ideas and opinions about this.
I am not able to find any Standard, Code, practices,.. to address such a thing.
Thanks a lot,
Frank
Calgary, Alberta