I'm trying to figure a way to install piers between a reinforced concrete grade beam above, and competent rock below. Reinforcing for the pier will be a single number 9 bar, doweled into the existing grade beam. After the bar is in place, I will have to put the sonotube around it, and the only way I can imagine to do that, is to cut a lengthwise seam in the tube, slip it around the rebar, and then stitch the seam back together.
Has anyone seen this done? Any suggestions on ways to securely close the seam? I'm considering some kind of bands or zip ties, possibly combined with polyurethane adhesive or heavy staples.
Has anyone seen this done? Any suggestions on ways to securely close the seam? I'm considering some kind of bands or zip ties, possibly combined with polyurethane adhesive or heavy staples.