I am designing a chute spillway.
I was thinking of prescribing the concrete as C30/37 but I am having second thoughts of prescribing the concrete as C35/45
The environment is cyclic wet and dry. Hence according to Eurocode it is XC4 class designation.
The design working life of the structure is 100 years.
However the member has a slab geometry, special quality control of thge concrete production will be ensured and there will be a composition demanding low permeability e.t.c
I was thinking of prescribing the concrete as C30/37 but I am having second thoughts of prescribing the concrete as C35/45
The environment is cyclic wet and dry. Hence according to Eurocode it is XC4 class designation.
The design working life of the structure is 100 years.
However the member has a slab geometry, special quality control of thge concrete production will be ensured and there will be a composition demanding low permeability e.t.c