we already waited 28 days and did the special tests on the existing footing, it failed
client didn't accept to check and adjust the design for 22 Mpa
we have 2 options
1-remove the footing and reconstructing from the beginning
2-cont the pedestal bars and consider the existing footing as blinding concrete and do the constructing from the beginning also
which one do you thik best
and is there another options