Thanks for everyone who have replied to my query regrading missing parts.
I would like to add some more points as requested by all of you.
This is a manual assembly process in a cell, where the operator starts assembling the starter motor assembly at station no. 1 and finishes at station no. 16.
We have provided some fatigue reduction items like, fastening using pneumatic screw drivers, clamping using pneumatic applications, moving components/ part sub assembly in trolleys.
An operator will produce around 75 starter motors in a 9 hour shift, and depending upon the demand, we will deploy a maximum of 12 operators in one assembly line .
The total weight of the final product is around 4 kg, so as suggested by some of you, it may not be possible for us to use weight as a measure for checking.
We have about 30 varieties of starter motors assembled in one line. Hence kitting will also lead us to confusions.
We have provided enough training to the operator, but still the missing parts are taking place.
Are there any other method being followed in similar electro mechanical component industry, to identify missing parts.
I would like to thank once again the members for the response, and I would be glad to see much more responses from more memebers of this forum.
Regards
V Venkatesh