tatlow
Mining
- Aug 21, 2007
- 1
I AM MAKING SUBGRADE FOR A ROAD WIDENING AND HAVE A LOT OF EXISTING UTILITIES IN AND JUST BELOW SUBGRADE. I HAVE THE ROAD GUTTED OUT AND THE GRADE IS PUMPING.
LIME TREAT IS NOT POSSIBLE, WHAT ARE THE BEST METHODS. I AM GOING TO ATTEMPT TO REP THE AREAS TOMORROW WITH A SKIP LOADER, A BLADE WONT FIT IN THE AREA.
I WILL PROBABLY GO TO FABRIC AND GEOGRID, JUST LOOKING TO SEE IF THERE ARE ANY OTHER SOLUTIONS.
LIME TREAT IS NOT POSSIBLE, WHAT ARE THE BEST METHODS. I AM GOING TO ATTEMPT TO REP THE AREAS TOMORROW WITH A SKIP LOADER, A BLADE WONT FIT IN THE AREA.
I WILL PROBABLY GO TO FABRIC AND GEOGRID, JUST LOOKING TO SEE IF THERE ARE ANY OTHER SOLUTIONS.