Okay. That makes sense. Different regions, different approaches. Also makes sense that the connection at least seems to have some thought put into it.retired13 said:As I am aware off, the detailer's office usually have structural engineers (licensed, or by trade) to perform one job only - design the connections.
Why would it be? You are adding more steel.Veer007 said:Guys, slotting HSS column at base would not be an issue?
Veer007 said:Guys, slotting HSS column at base would not be an issue?
retired13 said:The only thing bothers me is I don't know how to analyze the gusset as shown now.
JAE said:Essentially they are demanding that you weld on the inside of the tube column to the gusset plate.
KootK said:For the sake of argument, imagine that our column here was really a double channel. Would OP's weld symbol be appropriate then?
retired13 said:Guessing from the geometry, the 1/2" connecting plate may suffer approximately 15 kai compressive stress. It's ok, or not?
retired13 said:Quite impressive.