RFreund
Structural
- Aug 14, 2010
- 1,885
I'm curious to know others feelings on the attached detail where the foundation wall is notched for the slab. Is there any concern for cracking due to the soil settling more than the portion of the slab that is over the foundation wall? I would think that any difference would be small and not cause any issues. How about the thickened slab edge? Usually I'm not a fan due to the increased "drag" during shrinkage but maybe I'm wrong here.
I suppose this relates to this thread as well:
EIT
www.HowToEngineer.com
I suppose this relates to this thread as well:
EIT
www.HowToEngineer.com