I have a project that is under construction where I have specified mezzanine beam connections to metal building columns using simple double-angle shear connections welded to the columns. In accordance with the AISC Steel Construction Manual and the 360-05 Specification, I specified that they weld the outstanding vertical legs, with a 1/2" return at the top. The specific references are Part 10, pgs. 10-7 & 10-8, and Spec Sections J1.2 & J2.2b. The way I read it, the requirement is that you must provide flexibility in the angles, allowing end rotation, in order to design the connection for reaction shears only. Limiting the return across the top allows the beam to rotate because the angles can flex.
As you may have guessed, they fully welded the angles, all three sides. Many of these are fairly light connections (edge girders), typically with a 3 row bolted connection at the beam web, with a maximum reaction of about 18 kips. But there are interior girder connections, 4 row, with a maximum reaction of 32 kips. All are composite beams. Question is, do I need to ask them to remove the additional weld at the top? They're likely to do more harm than good, and there's not enough room for them to be able to get in and remove the welds with a grinder.
As you may have guessed, they fully welded the angles, all three sides. Many of these are fairly light connections (edge girders), typically with a 3 row bolted connection at the beam web, with a maximum reaction of about 18 kips. But there are interior girder connections, 4 row, with a maximum reaction of 32 kips. All are composite beams. Question is, do I need to ask them to remove the additional weld at the top? They're likely to do more harm than good, and there's not enough room for them to be able to get in and remove the welds with a grinder.