miblec2009
Electrical
- Feb 4, 2013
- 4
Hi Guys,
I have been looking days and days for something in the code to help me in my inquiry but it seems it will take long time, so i decided to take it short to here for any help , I have in my project 122 Air Handling Units suspended to the ceiling of an IKEA Mall here in Cairo, Egypt & at the original design the consultant is putting a DOL Stsrter (BESIDE EACH AHU) in a seperate enclosurem and it is needed to shut down the AHU in case of fire by the BMS @ area or zone having fire, so you will shut down all AHU's in areas having fire, but i have already the cable feeding these AHU's a Non-Fire Resistant Cable, moreover when the BMS disconnect the starter in case of fire at that zone, you will still having power at the feeder cable feeding the starter itself? is it logic? we discussed with the consultant to transform the power panel in the electrical room suppling these units to be an MCC and cancel all these starters, i.e. centeralize the feeding and control from one panel located in the electrical room, the consultant is convinced but he needs any support from any code NEC or NFPA saying any recommendations regarding. 1) centeralizing the feeding and control of the units. 2) The feeder cables have to be changed to Fire Resistant Cables? 3) The most wanted code article is the one recommend that in case of fire we should disconnect the power cable from its source, and its not recommended to leave any cable (not fire resistat) having power in the same area having fire.
Thanks & Best Regards.
I have been looking days and days for something in the code to help me in my inquiry but it seems it will take long time, so i decided to take it short to here for any help , I have in my project 122 Air Handling Units suspended to the ceiling of an IKEA Mall here in Cairo, Egypt & at the original design the consultant is putting a DOL Stsrter (BESIDE EACH AHU) in a seperate enclosurem and it is needed to shut down the AHU in case of fire by the BMS @ area or zone having fire, so you will shut down all AHU's in areas having fire, but i have already the cable feeding these AHU's a Non-Fire Resistant Cable, moreover when the BMS disconnect the starter in case of fire at that zone, you will still having power at the feeder cable feeding the starter itself? is it logic? we discussed with the consultant to transform the power panel in the electrical room suppling these units to be an MCC and cancel all these starters, i.e. centeralize the feeding and control from one panel located in the electrical room, the consultant is convinced but he needs any support from any code NEC or NFPA saying any recommendations regarding. 1) centeralizing the feeding and control of the units. 2) The feeder cables have to be changed to Fire Resistant Cables? 3) The most wanted code article is the one recommend that in case of fire we should disconnect the power cable from its source, and its not recommended to leave any cable (not fire resistat) having power in the same area having fire.
Thanks & Best Regards.