As a professional engineer in Alberta, I signed Schedule B-1 to authority that I will responsible for field review of concrete foundation. However, field review was performed by site engineers. Everything is arranged by the company. Now the construction is complete. I need to sign on Schedule C-2 to authority that I have fulfilled my obligation for field review.
I feel uncomfortable to sign on C-2 because I did not know much about construction. I am thinking to get some information from site, such as field review report, concrete inspection reports, name of shop drawing reviewer, qualification of those engineer, inspector and shop drawing reviewer.
Is it necessary and appropriate for me to ask such information, especially the qualification of person? Should I sign on C-2 because the company has arranged everything?
Any comments and suggestion are appreciated very much. Thanks.
I feel uncomfortable to sign on C-2 because I did not know much about construction. I am thinking to get some information from site, such as field review report, concrete inspection reports, name of shop drawing reviewer, qualification of those engineer, inspector and shop drawing reviewer.
Is it necessary and appropriate for me to ask such information, especially the qualification of person? Should I sign on C-2 because the company has arranged everything?
Any comments and suggestion are appreciated very much. Thanks.