BearcatEngineer
Structural
I have a situation where the anchor bolts for a sign structure were set too short and with the sign fully erected, the bolts are 2-3 threads short of the top nut. Is it possible to correct this without demo of the foundation and resetting anchor bolts and pouring another foundation.