I am designing the pipe layout of a sewer force main that runs parallel to an existing gravity sewer.
I found out that there has to be a 10' clearance between the force main and a water main but what about the horizontal clearance between the new force main pipe and the existing gravity sewer pipe?
Also is there a recommended vertical clearance as well between force main pipes and gravity sewer pipes?
Thanks in advance for any help.