Time for a little personal opinion;
I have worked with clients that have a separate WPS for each weld type and groove type. Their engineering staff, QC, and production were quickly overwhelmed with trying to keep up with the paperwork. The welders, well let's say they tended to put the volumes of WPSs in a corner and rarely bothered to look at them. If the welders are handed too much paperwork it is not going to be used. It’s a fact, I’m sadden to say; welders are not in favor of needless paper.
The welders need direction and they need a system they can refer to when they have a question about the particulars of fit-up, welding parameters, acceptance criteria, and repairs. A streamline system that can provide them with the information they need will be used. That's why I use a basic WPS that tells the welders the particulars of the process used, filler metal required, shielding gas, etc. I use a system of annexes that are referenced by the WPS to address the specifics of the base metal specifications, groove details, fit-up allowances, and acceptance criteria.
Many welders have little knowledge of what base metal specifications are included in each family of P numbers (ASME), M numbers (AWS B2.1), S numbers (NAVSEA), or Groups numbers (AWS D1.1). Pick up a length of pipe and while there is a considerable amount of information printed along the length, however the P number isn’t included. By simply including a reference to the P number and an annex in the WPS, the welder has an additional source of information. The annex lists the P number and all the material specifications (including grades) and product forms included in that P number family. This is also where I list the specific preheat requirements based on material thickness.
Likewise, weld details can be addressed in a similar manner. AWS D1.1 includes somewhere on the order of 120 prequalified groove and fillet details. There is no need to include all the sketches in the WPS if an annex is referenced by the WPS. In conjunction with the annex, the drawing should include the particular groove designation in the tail of the welding symbol. The welder simply looks in the annex to see what the nominal values are for the groove angle, root opening, whether backing is required, etc.
I believe most everyone understands that the acceptance criteria may change from one project to another or from one connection to another. The welders should be informed what criteria is applicable. Again, an integrated system can be used. The particular acceptance criteria can be listed, wait for it……. in the tail of the welding symbol. If one is working to a structural welding code, the welding symbol is a simple vehicle that can be used to specify what connections/joints are subject to the acceptance criteria of a statically loaded or cyclically loaded connection. In the case of ASME pressure piping, a note on the drawing can be used to inform the welder whether the piping is categorized as B31.3 Normal, M, or high pressure. The welder then knows what criteria is applicable to the particular project by looking at the appropriate annex.
Inspectors also need the same information. They shouldn’t have to spend time hunting through the project specifications to see if the information is buried somewhere in that document. It should be included on the drawing. This reminds me of a job several years ago where the project inspector announced he just rejected 90% of the pipe welds. I asked what piping code applied. He responded with, “It’s just pipe.” I asked the project manager, he replied, “It’s just low-pressure pipe.” Even the contractor’s site foreman said, “It’s just pipe.” Talk about a failure to communicate.
The bottom line is an integrated system can be easily instituted to address the needs of the designer, welder, and the inspector. However, a little thought is required on the “front end” to develop a system that can be easily instituted and navigated by those expected to use it.
Granted, a production facility that produces a limited number of products, each requiring a couple of different weld types can get away with a couple of WPSs that are specific to that gizmo they’re building. The problem is more difficult to solve when there many different products being fabricated that involves many weld types where having many separate WPSs can get out of hand very quickly. Each situation should be considered and a system developed that is easy to implement and used. There is no one cookie cutter approach that applies to every situation.
Best regards - Al