Not every time. You can use sensitive leak test, after hidrotest ( normally in construction phase to ensure the integrity of the line)to check the joints out of test during Hydro, like control valves, conections to vessels, towers, exchangers........(STL normally is used during pre-commisioning and commisioning Phases). Go to Chapter VI ASME B-31.3 (Both are really differents, and looking for differents targets).