I was given the responsibility of choosing turbine for a hydropower of 3 MW and we asked turbine manufacturer to supply the turbine with their preliminary specfication .They provided two turine with following spec
option-1 option-2
Head 135 135 m
discharge 3 m3/s 3 m3/s
Rated ouptput 3 MW 3 MW
type of machine Francis Pelton vertical
dia of runner 636 mm 1070 mm
regulation type 16 guide vanes 6 nozzle
genertor speed 1000 rpm 428.6
efficiency
100% load 91.8 89.1%
90% load 93.5 90.0
80% load 93.0 90.4
70% load 91.4 90.5
now the question is which turbine is better or which one should I prefer to choose.
Please suggest
regards
I was given the responsibility of choosing turbine for a hydropower of 3 MW and we asked turbine manufacturer to supply the turbine with their preliminary specfication .They provided two turine with following spec
option-1 option-2
Head 135 135 m
discharge 3 m3/s 3 m3/s
Rated ouptput 3 MW 3 MW
type of machine Francis Pelton vertical
dia of runner 636 mm 1070 mm
regulation type 16 guide vanes 6 nozzle
genertor speed 1000 rpm 428.6
efficiency
100% load 91.8 89.1%
90% load 93.5 90.0
80% load 93.0 90.4
70% load 91.4 90.5
now the question is which turbine is better or which one should I prefer to choose.