UcfSE
Structural
- Dec 27, 2002
- 2,525
The IBC requires certain seismic data to be on the plans. When dealing with a metal building system, we won't know some of that data until after the metal building engineer has determined it. How do you typically handle this on your plans, "TBD by metal building manufacturer" or something else?