Big mahalos for the replies - I'm not sure if I know what a snout is.
Dry, windy, sandy, open area. Ten year 1-hr design storm is 2.25".
I'm leaning towards doing nothing special to screen sediment, just letting the drywell fill. If it's filled with stone, they'll have to clean it every 8 years. If I only put stone in the bottom 2 feet, it might have to be cleaned in 25 years. Obviously the latter is cheaper and faster. I've just never designed one that way. If there's a reason for that I can't remember. That's why I was wondering if anyone's done it with stone only at the bottom.