Hi,
We review a whole bunch of shop drawings (OWSJ, Structural Steel, Rebar, etc.) and was wondering as to what is industry standard when it comes to when these drawings are signed/sealed. Should this be done before the review (ie. we receive shops that are signed/sealed) or can this be done after the review but before project completion, as long as the EOR has records of signed/sealed shops to sign off on the project? Thank you.
Clansman
If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.
We review a whole bunch of shop drawings (OWSJ, Structural Steel, Rebar, etc.) and was wondering as to what is industry standard when it comes to when these drawings are signed/sealed. Should this be done before the review (ie. we receive shops that are signed/sealed) or can this be done after the review but before project completion, as long as the EOR has records of signed/sealed shops to sign off on the project? Thank you.
Clansman
If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.