I have a project in which the slab-on-grade is an 8" thick two-way flat plate slab.
The building is being renovated and the Mechanical Engineer has shown the existing slab being saw cut and trenched to install new under slab plumbing. There are at least two trenches that run the length of the building and also a few that run the width of the building. The width of the trench is about 2 feet.
I am having a hard time figuring out a way to have the slab repaired after the plumbing is installed to behave as a two-way structural slab again.
Any ideas or guidance would be appreciated.
The building is being renovated and the Mechanical Engineer has shown the existing slab being saw cut and trenched to install new under slab plumbing. There are at least two trenches that run the length of the building and also a few that run the width of the building. The width of the trench is about 2 feet.
I am having a hard time figuring out a way to have the slab repaired after the plumbing is installed to behave as a two-way structural slab again.
Any ideas or guidance would be appreciated.