Same here maybe a little shy career wise,....will probably never retire however. Doing the whole package, drawings, calcs, site retaining walls, grading plans under duress, in CA seismic zones 3 and 4. Can't imagine 1.5 hours to even set up a job, let alone the 12 hours of seismic load take off, path and hold down calculations I just completed yesterday, not including respective footing design, or drilled caisson site containment/foundation walls. IF I were to work continuously, ignoring all other work, my custom home projects would take a month to two or more to complete with numerous custom details, all seismically sensitive; to complete the whole shebang, not uncommon from first point of contact, through Arch/owner changes, and permitting site grading, retaining wall and dwelling structure submittals and resubmittals for the project to easily drag out to a year or more. Owners manage to milk a lot of free consultation time out of you during that time frame, especially on the owner/builder front, not uncommon to have to set ground rules/limits, tough without offending your clients. For these once and awhile rich guy homes, have to give an approximate not to exceed fee and send monthly invoices for time and effort spent since a decent percentage of projects I've worked on are on hold and/or were never built even if design was complete. Should have been a magician like my father wanted me to be, he must be turning over in his grave right now,..."Structural Engineer,..what was he thinking!", he must be saying to himself. Have a good one. Good luck with the truss, AELLC