hello all,
Can anyone tell what is run of tube ?
And, if "Run of tube B thru H" is defined in the drg, why the points B and H are not defined in the points data table, instead they are defined in the inspection data table.
Thanks in advance !
Can anyone tell what is run of tube ?
And, if "Run of tube B thru H" is defined in the drg, why the points B and H are not defined in the points data table, instead they are defined in the inspection data table.
Thanks in advance !